Sourcing FAQ

Questions, answered straight

The numbers below are the same ones our quotations carry — MOQ, lead time, shipping classification, payment terms and the order process from spec to shipment. If your question is not on this page, it belongs in an email: every RFQ gets an engineering reply within 48 hours.

The order process

From spec to shipment in six gates

Spec definition

You send the rack or system power profile, ride-through window and bus voltage. We map it to cell count, capacitance class and ESR targets before anything is quoted.

Cell selection

Tier-1 LIC cells are shortlisted against your voltage window, temperature range and cycle duty — 3.8 / 4.0 V classes, cylindrical or prismatic.

Sorting plan

C/ESR dual-parameter sorting is planned so the module ships inside a ±5% window — tighter than the −10/+30% factory spread cells arrive in.

Samples

First articles built with your balancing, structure and connector options. Samples ship 2–10 pcs, each with full test data.

Certification support

IEC 62391 test reports, CE declaration of conformity and UN 3499 shipping documentation prepared for your lane and carrier.

Mass production

Laser welding, BMS assembly, aging and 100% final test. Standard lead time 4–6 weeks; custom first articles 8–12 weeks.

Trade terms

The commercial table, as quoted

No hidden tiers and no "contact us" games — these terms ship with every quotation and only move downward with volume.

ItemTerm
Sample MOQ — standard modules2–10 pcs, test report included
MOQ — custom modules50–100 pcs first production lot
Annual frame agreement≥1,000 pcs with tiered pricing
Lead time — standard4–6 weeks
Lead time — custom8–12 weeks first article, then 4–6 weeks recurring
IncotermsFOB Shanghai / Ningbo standard; CIF and DDP on request
PaymentT/T 30% deposit, balance before shipment
Quote responseWithin 48 hours, engineering-signed

Full FAQ

Questions we get every week

Cells and modules above 0.3 Wh of energy ship as Class 9 dangerous goods under UN 3499. Every CapStack module leaves with UN 3499-compliant packaging, marking and documentation, and we confirm the paperwork against your lane and carrier before booking.
Yes. Air freight runs under IATA A186 with packing instruction PI 971. We keep per-cell energy inside the accepted envelope for air transport and issue the carrier documents with each shipment.
Cells follow the UL 810A route for electrochemical capacitors, and modules are tested to IEC 62391 methods. RoHS, REACH and WEEE compliance covers the supply chain, CE ships as a declaration of conformity, and automotive programs can reference IEC 62576 and AEC-Q200.
Cycle class is 500,000+ cycles on a 3.5 V to 2.5 V window and around 50,000 cycles on the full 4.0 V to 2.5 V window — lowering the working voltage extends life sharply. Rack integrators qualify our modules against a 15-year design life class.
Cell chemistry is rated −40 °C to +70 °C by series; standard module builds are specified from −40 °C to +65 °C. Cold starts at −40 °C are a core use case — wind pitch and outdoor cabinets run them routinely.
Every series string does. Modules ship with resistive, passive or active balancing, and the management board auto-balances module-to-module in parallel stacks. Board sleep current is under 20 µA for always-standby applications.
A per-module test report — capacitance and ESR measured, logged against serial number — plus cell-level traceability. 100% of cells are logged, so a field return can be traced back to its cell lot.
Six gates: spec definition, cell selection, sorting plan, samples, certification support and mass production. Custom first articles run 8–12 weeks, then 4–6 weeks recurring. Voltage, structure, balancing and connectors are all open variables.
T/T with 30% deposit and the balance before shipment. Annual frame agreements at 1,000 pcs or more unlock tiered pricing — the frame terms are written into the quote.
Yes — standard catalog modules ship as samples from 2 to 10 pcs, each unit carrying its own test report, so what you qualify is what you scale.
Warranty is stated per quotation rather than as a blanket number, because operating voltage window, temperature and cycle duty set the real aging curve. Agree the duty profile and the warranty term is fixed in the order confirmation.
Samples: 2–10 pcs on standard modules. Custom modules: 50–100 pcs for the first production lot. Annual frames start at 1,000 pcs with tiered pricing.
Standard modules: 4–6 weeks. Custom first articles: 8–12 weeks, then 4–6 weeks recurring production. The clock starts at order confirmation, not at RFQ.
ODM: you give us the electrical and mechanical spec and we engineer the module on our cell platform — balancing, structure, BMS and connectors. OEM: you bring the design and we build to your drawings on our line. Most rack projects start ODM and migrate to OEM drawings at scale.
From tier-1 supercapacitor cell manufacturers on a RoHS / REACH / WEEE-compliant supply chain. We buy cells, not slogans — every cell lot is incoming-inspected and logged before it reaches the sorting line.
For evaluation, no — 2 pcs is a valid order. For production, standard modules typically start at 50 pcs; the exact figure is per product line and stated in the quote.
Every RFQ is answered within 48 hours — with a cell count, a capacitance class and a lead time, not a brochure.
Load power and ride-through window, bus voltage range, operating temperature, cycle duty and annual volume. Those five fields are enough to return a real number in 48 hours.

One question left?

Terms questions fit in the same email.

Send the RFQ with your duty profile and shipping destination — the reply lands within 48 hours with a cell count, a capacitance class and a lead time, FOB Shanghai or Ningbo.